MILPRF19500/519E
3.3 Abbreviations, symbols, and definitions. Abbreviations, symbols, and definitions used herein shall be as
specified in MILPRF19500 and herein.
IP
Peak operating forward pulse current.
Peak transient forward current.
Iptr
Luminous intensity (the subscript V is used to designate a photometric or visual quantity to
IV
differentiate from I as used herein for current).
λV
Peak radiometric wavelength of diode light emission.
mcd
Milli-candela; the candela is a unit of luminous intensity defined such that the luminance of a
blackbody radiator at the temperature of solidification of platinum is 60 candelas per square
centimeter.
Θ
The angle at or off the axis of symmetry of a light source at which luminous intensity is measured.
3.4 Interface and physical dimensions. The interface requirements and physical dimensions shall be as specified
3.4.1 Lead finish. Unless otherwise specified, the lead finish shall be solderable as defined in MILPRF19500,
MILSTD750 and herein. Where a choice of lead finish is desired, it shall be specified in the acquisition document
(see 6.2).
3.4.3 Terminal lead length. Terminal lead lengths other than that specified on figures 1 and 2 may be furnished
when so stipulated in the acquisition document (see 6.2) where the devices covered herein are required directly for
particular equipment-circuit installation or for automatic-assembly-technique programs.
3.5 Electrical performance characteristics. Unless otherwise specified herein, the electrical performance
3.6 Electrical test requirements. The electrical test requirements shall be the subgroups specified in tables I and II
herein.
3.7 Marking. Devices shall be marked as specified in MILPRF19500.
3.8 Workmanship. Semiconductor devices shall be processed in such a manner as to be uniform in quality and
shall be free from other defects that will affect life, serviceability, or appearance.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:
a.
Qualification inspection (see 4.2).
b.
Screening (see 4.3).
c.
4.2 Qualification inspection. Qualification inspection shall be in accordance with MILPRF19500 and as specified
herein.
4.2.2 Group E qualification. Group E inspection shall be performed for qualification or re-qualification only. In case
qualification was awarded to a prior revision of the specification sheet that did not request the performance of table III
tests, the tests specified in table III herein that were not performed in the prior revision shall be performed on the first
inspection lot of this revision to maintain qualification.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business